Notes on maintenance
The SIDOOR system should be included in the maintenance schedule for the system as a whole,
and inspected in the course of the maintenance intervals stated in the schedule.
An inspection should cover the following points:
• Visual inspection of the control device for contamination and damage
• Visual inspection of the motor for dirt and damage
• Visual and mechanical inspection of the mechanical system, in as far as it is part of the
SIDOOR elevator system. This includes checking the following components:
• Attachment of the motor holder, deflector pulley and mounting bracket
• Wear on the toothed belt
• Check and remeasure the parameters for the safety-related force and energy settings set
during commissioning.
Overview of commissioning a door drive
We recommend the following initial commissioning procedure for a door drive:
Table 9-1
Step
1
2
5
6
7
8
AT40 and ATD400V for elevators
System Manual, 06/2022, A5E42192709-AH
Procedure for commissioning a door drive
Procedure
Preparing the control device
Connecting a geared motor to the control device
Connecting the power supply to the network and executing
a learn run
Connecting digital input signals
Commissioning the control device on the CAN bus (option‐
al, only for control devices with corresponding module)
Final settings and checks
Connecting and commissioning
9.1 Overview of safety and commissioning
Reference
Preparing the control device
(Page 160) section
Connecting a geared motor to
the control device (Page 160) sec‐
tion
Connecting the power supply to
the network and executing a
learn run (Page 161) section
Digital input signals (Page 162)
section
Final settings and checks
(Page 163) section