Installing/removing and connecting analyzer and option modules
7.8 Wiring option modules
Procedure
③
④
⑤
⑥
Figure 7-11
1. Connect the option modules as follows after installation:
– OM 1.1 to the processing unit using the 50-pin ribbon cable
– OM 2.1 to the analyzer module FBG
– OM 2.2 to the analyzer module PCB
2. Attach the housing cover.
Tighten the cap nuts with a torque of 2.5 Nm.
66
Processing unit
Option module OM 1.1
Option module OM 2.1
Connection PU - OM 1.1
Cabling using OM 1.1 and OM 2.1 as an example
processing unit using the 12-pin CAN ribbon cable.
⑦
Plug contact AM1
⑧
Plug contact AM2
⑨
Plug contact CAN for OM 2.2
①
using the 26-pin ribbon cable
①
using the 26-pin ribbon cable and to the
Operating Instructions, A5E31874006-12
Rack-mounted device