Case Differentiations - Siemens SIPROCESS GA700 Operating Instructions Manual

Continuous gas analysis
Hide thumbs Also See for SIPROCESS GA700:
Table of Contents

Advertisement

NOTICE
Deletion of the analyzer module parameter assignment due to faulty operation during
commissioning
During commissioning after replacement of the AM electronics, a faulty operation can prevent
transfer of the parameters and render the AM electronics unusable. When you commission the
device once again after replacing the AM electronics, the following applies:
• First, confirm the message regarding the change of the configuration.
• Make sure to confirm the transfer of the parameters by pressing <ENTER>.
• Always carry out a normalization. To do this calibrate the analyzer module in the service
Note
Authorization level
To execute the actions described below, you must be logged on with at least the "Expert"
authorization level. You may have to log on again with the requested PIN.
Message panel for configuration change
When you change the hardware equipment of the device by replacing or adding modules or
components, the LUI alarm window "Device configuration changed" is displayed during re-
commissioning.
To start the data synchronization, confirm the alarm by pressing <ENTER>.
Depending on the concrete application adapt the required parameter sets in the message panel
"Transfer parameters". Information on the further procedure is available in the tables below.
5.5.3

Case differentiations

Table 5-5
Case
PM
New
New
1)
Data synchronization: PM parameters are transferred to the AMx (x=1 or 2), parameters of the AMx are
transferred to the PM
Rack-mounted device
Operating Instructions, A5E31874006-12
menu as follows:
"Main menu" > "2. Settings" > "20. Service" > "03. Factory calibrations" > "03. Normalization".
Plug & Measure - Commissioning
Description
AMx
New
Commissioning, PM without serial num‐
ber
New
Commissioning, each module has a seri‐
al number stored at the factory.
None of the modules has been connec‐
ted to another module before
Combined operation
5.5 Plug & measure permitted activities
Data synchronization/Action
Automatic data synchronization
Automatic data synchronization
1)
.
1)
.
45

Advertisement

Table of Contents
loading

Table of Contents