7.5
Connecting analyzer modules
7.5.1
Wiring OXYMAT 7
Overview
①
②
Figure 7-4
Procedure
1. When an option module OM 2.1 or OM 2.2 is installed:
Connect the option module to the interface
(AM FBG) using the existing 26-pin ribbon cable.
2. Connect the processing unit (PU) to the CAN interface on the AM-FBG
12-pin ribbon cable.
3. Establish power supply to the AM PCB from the power supply unit
"Connecting the power supply (Page 78)".
4. Attach the housing cover.
Tighten the cap nuts with a torque of 2.5 Nm.
5. Connect the gas connections, see "OXYMAT 7 (Page 71)".
6. Check the sample gas path for leaks, see "Checking gas paths for leaks (Page 97)".
Rack-mounted device
Operating Instructions, A5E31874006-12
Installing/removing and connecting analyzer and option modules
CAN interface, 12-pin ribbon cable
Connector for cable from power supply unit
Analyzer module printed circuit board, interfaces OXYMAT 7
7.5 Connecting analyzer modules
③
Interface, 26-pin ribbon cable to option mod‐
ule OM 2.1/2.2
③
of the analyzer module printed circuit board
②
①
using the existing
via the power cable, see
59