Installing/removing and connecting analyzer and option modules
7.5 Connecting analyzer modules
7.5.2
Connecting the ULTRAMAT 7
Overview
①
②
Figure 7-5
Procedure
1. When an option module OM 2.1 or OM 2.2 is installed:
Connect the option module to the interface
(AM PCB) using the existing 26-pin ribbon cable.
2. Connect the processing unit (PU) to the CAN interface on the AM-FBG
12-pin ribbon cable.
3. Establish power supply to the analyzer from the power supply unit
see "Connecting the power supply (Page 78)".
4. Attach the housing cover.
Tighten the cap nuts with a torque of 2.5 Nm.
5. Connect the gas connections, see "ULTRAMAT 7 (Page 72)".
6. Check the sample gas path for leaks, see "Checking gas paths for leaks (Page 97)".
60
CAN interface, 12-pin ribbon cable
Connector for cable from power supply unit
Analyzer module printed circuit board, interfaces ULTRAMAT 7
③
Interface, 26-pin ribbon cable to adapter card
③
of the analyzer module printed circuit board
Operating Instructions, A5E31874006-12
①
using the existing
②
via the power cable,
Rack-mounted device