DD+DIS303.03E
13
General
1
System components
Transport path
2
3
Installation version
Unloading and unpacking
4
Required external connections:
5
Film processor
6
Mixer
6
Silver recovery
Hose connections
7
Air conditioning system
8
9
Water connection
10
Free space around machine
Wall opening
11
Edition 6, Revision 0
Checklist for Installation Planning
Classic E.O.S. / Classic E.O.S. CL
(Type 5270 / 100 / 105)
Film processor
Daylight system
Mixer
Replenisher tanks
Centralized disposal
Disposal tanks
Silver recovery (fixer, water)
Sufficient floor load
Elevator (door size, load)
Door size
Daylight
Darkroom
Free space provided for lifting the
machines off the pallet
prepared:
All-pole circuit breaker
Outlet (distance to machine:_____m)
Outlet (distance to machine:_____m)
Outlet (distance to machine:_____m)
Supply and disposal through rear wall
Supply and disposal through the floor
Exhaust hose required, length_____m
Exhaust: connection piece installed on
site
Supply hoses installed
Disposal hoses installed
Exhaust connection installed
Exhaust rate sufficient
present
Required minimum guaranteed
considered
Installation Planning
yes no
yes no
Chapter 14 / 41