Fixed-Table Actuator Lab - GE OPTIMA MR360 Service Training

Atc mr instructor xiao xiao
Table of Contents

Advertisement

GE Healthcare

10. Fixed-Table Actuator Lab

Description:
Time Required:
Learning
Objective(s):
Support
Materials
Required:
Tools Required:
Safety
Considerations:
Steps:
Questions:
Review:
MR5047 SV
This lab will step the student through the procedure of replacing the
table actuator
2 Hours
Navigate the service documentation
Remove and reinstall the table actuator
Service Methods procedures – 5364191 on disk, or as loaded onto
system computer. Refer to Replacement/Fix Table/Table Electrical
Actuator.
(http://3.28.123.26:8000/mr/cdrom/5364191-
2EN/root/data/Signa_EXCITE/content/1100957.htm)
Standard non-magnetic hand tools
Follow all LOTO procedures.
incorporated in the documented procedures
1. Table Electrical Actuator Replacement
Follow the documented procedure in Direction 5364191.
Warning: The table must be removed from the
magnet room for this procedure.
Continue to Fixed Table Adjustment Lab once the table has been
remounted to the magnet
1. What method is used to align the mounting screw holes?
__________________________________________________
Questions for instructor:
______________________________________________________
______________________________________________________
______________________________________________________
They are posted in the lab and
Lab Guide
Page: 19 of 24

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Brivo mr355

Table of Contents