Replacing The Pto-Drive Belt - Toro Z Master Professional 7000 Series Operator's Manual

Hide thumbs Also See for Z Master Professional 7000 Series:
Table of Contents

Advertisement

Available languages

Available languages

Replacing the PTO-Drive
Belt
Service Interval: Every 50 hours—Check the
PTO-drive belt.
1.
Park the machine on a level surface, disengage
the blade-control switch, and engage the parking
brake.
2.
Shut off the engine, remove the key, and wait
for all moving parts to stop before leaving the
operating position.
3.
Loosen the front engine panel knobs and
remove the panel
Figure 88
1. Knob
4.
Remove the spring from the idler arm
89).
5.
Remove the clutch stop bracket.
6.
Remove the old PTO-drive belt.
7.
Install the PTO-drive belt around the clutch
pulley and the gearbox pulley
8.
Intall the rubber clutch stop.
9.
Install the spring to the idler arm
(Figure
88).
2. Front engine panel
(Figure
(Figure
89).
(Figure
89).
1. Gearbox
2. Spring
3. Spring-loaded idler pulley
g001312
64
Figure 89
4. Clutch
5. Rubber clutch stop
6. PTO-drive belt
g007176

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents