APRILIA RSV4 RR 2017 Service Station Manual page 304

Table of Contents

Advertisement

Engine
Tighten the six screws operating in
stages and diagonally.
Installing the clutch cover
REMOVING THE CLUTCH CONTROL PIN
BUSHING
Before carrying out the removal of the
bushing, it is necessary to thread the
inside to allow the extractor to tighten
sufficiently.
Warm up the cover.
Using a generic extractor, it is then
possible to remove the bushing from
the cover.
INSTALLING THE CLUTCH CONTROL PIN
BUSHING
Before carrying out the installation of
the bushing, it is necessary to warm up
the cover.
Position the guide (1) to insert the
bushing (2) as indicated in the figure.
Insert the bushing so that the process-
ing notch (3) is aligned with the notch
on the guide (4).
ENG - 304
RSV4 RR-RF

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rsv4 rf 2017

Table of Contents