Symantec NetBackup 5020 Routine Maintenance page 29

Table of Contents

Advertisement

NetBackup 5020
Routine Maintenance
The NetBackup 5020 must be powered off before replacement of a fan. A scheduled outage
period must be arranged.
Issue 01 (2010-12-10)
If the indicator remains off, unplug and then plug in the disk module.
If the problem persists, replace the disk module.
If the problem still persists, contact technical support.
Power running/alarm indicator
If the power running/alarm indicator blinks orange, see Symptom 1 mentioned in
"Power Module Alarm" in the NetBackup 5020 Hardware Troubleshooting Guide.
If the power running/alarm indicator remains off, reinsert the power module.
If the problem persists, replace the power module.
If the problem still persists, contact technical support.
Fan running/alarm indicator
If the fan running/alarm indicator blinks orange, see "Fan Running/Alarm Indicator Is
Red On" in the NetBackup 5020 Hardware Troubleshooting Guide.
If the fan running/alarm indicator remains off, unplug and then plug in the fan
module.
If the problem persists, replace the fan module.
If the problem still persists, contact technical support.
Link indicator for the IPMI management network port
If the link indicator remains off, unplug and then plug in the network cable.
If the problem persists, replace the network cable.
If the problem still persists, contact technical support.
Link indicator for the service network port (NIC1/NIC2)
If the link indicator remains off, unplug and then plug in the network cable.
If the problem persists, replace the network cable.
If the problem still persists, contact technical support.
ACT/LNK indicator for the 10GE NIC
If the ACT/LNK indicators for the 10GE NIC remains off, unplug and then plug in
the network cable.
If the problem persists, replace the network cable.
If the problem still persists, contact technical support.
Symantec Corporation
3 Guide to Routine Maintenance on Equipment Site
3-9

Advertisement

Table of Contents
loading

Table of Contents