Installation Guide
Figure 19: Front Rail Release Clip Operation
g. Use a level to make sure that the rails are aligned properly.
h. Follow these steps for the other outer rail.
Step 5 : Install the rail mounting hardware, starting with the uppermost rack mounting hole of the 4U
space on the front of the rack.
CMA Standard:
a. Install one cagenut at the uppermost mounting hole of the 4U space that the enclosure will
occupy.
b. If the Ultrastar Serv60+8 will be installed in a rack for shipping purposes, install four more M5
cage nuts in the holes 3-6 of the 4U space. These will receive the M5 x 12mm T15 Flat Head
Torx screws that secure the enclosure to the rack with the shipping bracket.
5. Installation
5.2 Rails Installation
50