OPERATION 6
6.12 TRANSPORTING ON A TRAILER _________________________________________
The machine is fitted with tie-down loops front and rear. Always tie down the machine securely to the trailer.
Always follow any recommendations for maximum trailer weights given in your towing vehicles handbook.
IMPORTANT
Use the chart in the specification section 12.2 to calculate the total weight of your machine
configuration.
Do Not exceed the maximum gross weight shown on the trailer plate.
Always read the trailer manufactures and towing vehicle manufactures handbooks before towing.
6.13 SLINGING AND JACKING THE MACHINE __________________________________
Slinging
When slinging the machine a set of four damage free wheel clamps must be
used, similar to the one shown, in conjunction with a certified lifting frame.
WARNING
Care should be taken when jacking or slinging machines.
Only trained personal should carry out this procedure.
Jacking points
There are four jack points indicated on the machine, two on the rear axle and two
on the front axle. This decal indicates the correct lift point.
en-51