Enterasys Matrix E1 1G587-09 Installation Manual page 50

Enterasys matrix e1 1g587-09: install guide
Hide thumbs Also See for Matrix E1 1G587-09:
Table of Contents

Advertisement

Installation
Figure 3-12 Device, Rear View
AC power cords
AC power receptacles
3. Observe the LANVIEW LEDs. The Power (PWR) LED (not shown), located on the front panel,
turns ON (green) and the CPU turns red until the device completes its initialization. It takes
under 30 seconds for the device to boot up.
NOTE: If the power-up sequence is interrupted on this device, or if optional hardware
has been installed or removed, this device may run an extended diagnostics sequence
that may take up to two minutes to complete.
If the initialization process is successful, the CPU LED turns green. If the CPU LED does not turn
green, refer to
Chapter 4
3-20
Hardware Installation
Á
Â
for troubleshooting information.
Â
AC power outlets. Each outlet is on a separate circuit.
Á
À

Advertisement

Table of Contents
loading

This manual is also suitable for:

Matrix e1 1g582-09

Table of Contents