Pull Roller Nip - GBC TITAN 165 Instruction Manual

Hide thumbs Also See for TITAN 165:
Table of Contents

Advertisement

Titan 165/ 110 Technical Service Manual

2.2 Pull roller nip

This calibration ensures the pull rollers nip is even
from left to right. Pull roller nip should be performed at
time of installation.
Tools required
• Two rolls of thermal film ( see film width below )
T110 = 41 in. rolls / T165 = 51 in. rolls
• 2.5 mm allen wrench
• 3 mm allen wrench
• 5 mm allen wrench
• # 2 phillips screwdriver
• Small flat tip screwdriver
A lw ays practice lock out/ tag out procedures
w hen perform ing service related w ork.
a) Set up he machine as you would for two sided
thermal encapsulation.
b) After webbing the machine, run the machine while
observing the quality of the output without paper,
then with paper. If the output quality is good,
STOP. If not, continue with the next step.
© GBC Films Group October 2000
C AU T IO N
IN F O R M A T IO N
A ny w aves in the lam inate and/ or w aves at
the m ain roller nip constitute poor output.
G o od ou ptut
c) With a 3 mm allen wrench, remove the lift handle
from the control side cabinet.
d) With a 2.5 mm allen wrench, remov ethe upper
and lower unwind brake handles.
e) With a #2 phillips head screw driver, remove
both cabinets.
Calibrations
Poo r ou ptut
Page 2 - 3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Titan 110

Table of Contents