62Z7B000.book 7 ページ 2012年9月27日 木曜日 午前10時21分
dummyhead
dummyhead
CIRCUIT PROTECTOR INSPECTION
Remove the circuit protector (page 11-4).
Check the continuity between the terminals.
If the correct continuity is not obtained, replace the
circuit protector.
FUSE INSPECTION
Remove the main fuse (page 11-4).
Visually inspect the fuse to see if it is blown.
Check continuity across the two blades.
Replace the fuse if it is blown or there is no continuity
across the blades.
MAIN FUSE:
GX270H:
GX390H1:
Switch position
Continuity
ON
OFF
QBE1, QXE9: 5 A
VKK:
15 A
5 A
Yes
No
OTHER ELECTRICAL
ON
OFF
BLOWN
11-7