Testing an ISDN BRI trunk

Removing the test setup

553-3001-218
Standard 2.00
Testing ISDN BRI functions
Procedure 40
Perform a B-channel Switched Virtual Circuit packet data transmission
test using an MPH
1
From an ISDN BRI B-channel packet data terminal, dial the Network
Terminal Numbers (NTNs) as configured in LD 27. Establish an active
call connection.
2
After the call-originating ISDN BRI terminal receives an
acknowledgment that the receiving ISDN BRI terminal is ready, the call
originating ISDN BRI terminal can begin transmitting packet data.
3
Verify that the transmitted data has been received successfully by
checking the transmitted information for accuracy. Read the information
on the screen or print it on the local printer.
4
Perform this test between two ISDN BRI terminals on the same MPH for
local transmission and between a system ISDN BRI terminal and a
remote ISDN BRI terminal over the packet data network.
5
Release the connection.
Procedure 41
Perform procedure to test an ISDN BRI trunk DSL
1
Set up the ISDN trunk test configuration to be used, as described
previously in the chapter "Set up ISDN BRI test terminals and trunks".
2
Place a call across the ISDN BRI trunk.
3
Complete the call and hang up.
After acceptance testing has been completed and the results show the system
is operating correctly, remove the ISDN BRI terminal setup and configure
ISDN BRI equipment according to the customer configuration. If the actual
customer configuration was used to perform these tests, no changes are
needed.