2Unpacking to installation
(2) Notes on base unit installation
If it installs the robot CPU system in the plate etc., please fully take into consideration the operativity,
conservativeness, and environment-proof.
1) Installation dimension
Five fixing screws (M4x14)
5-取付けネジ(M4×14)
OUT
5V
SG
POWER
FG
Ws
1
Table 2-3 : Installation dimension
Dimension place
W
Ws1
Ws2
Ws3
H
Hs1
Hs2
2) Unit installation position
Secure the following distance for the unit up-and-down section, and the structure and the parts, and
breathability and the convertibility of the unit are upgraded.
<Q172DSRCPU>
The position of the ceiling of the plate or the wiring duct section
MELSEC
Q03DCPU
Q61P
POWER
MODE
RUN
ERR.
USER
BAT.
BOOT
PULL
USB
PULL
RS-232
5mm
or more
Fig. 2-5 : Installing dimensions of the robot CPU unit
2-18 Installation and connection
CPU
I/O0
I/O1
I/O2
Ws
2
Q38DB
328
15.5
170±0.3
138±0.3
98
7
80±0.3
Motion CPU unit
Q173DCPU
QX40
QX40
Q172DEX
Q173DPX
0 1 2 3 4 5 6 7
0 1 2 3 4 5 6 7
SY.ENC
TREN
PLS.A
PLS.B
TREN
8 9 A B C D E F
1
1
1
1
1
8 9 A B C D E F
2
2
2
2
2
3
3
3
SW
1
2
STOP
RUN
CAUTION
EMI
SY.ENC1
PULSER
FRONT
BAT
Q172DEX
Q173DPX
I/O4
I/O5
I/O3
I/O6
W
Q312DB
439
249±0.3
40mm
or more
Plate
I/O11
I/O11
Q312DB
100mm
or more
5mm
or more
I/O7
I/O8
I/O9
I/O10
I/O11
I /O11
Ws
3
Base unit
Motion CPU unit
123.5mm
Q312DB
Door
100mm
or more