Precautions On Base Unit Installation - Mitsubishi Electric MELCEC Q Series User Manual

A mode
Table of Contents

Advertisement

9.
LOADING AND INSTALLATION
9.1.2

Precautions on base unit installation

(1)
OUT
(2)
*3
5mm or more
Installation dimensions
Mounting dimensions of each base unit are as follows:
CPU
5V
SG
FG
I/O0
POWER
QA1S33B
W
255
Ws *1
235
H
Hs *1
*1
The tolerance of Ws and Hs is
Module installation position
The shadowed area represents
the ceiling, wiring duct, or parts
in the control panel.
*2
In the case the height of the wiring duct is 50mm or less. In other cases, the figure should be
40mm or more.
*3
The figure should be 20mm or more if an extension cable is connected without removing the
next module.
*4
The figure should be 80mm or more for the connector type module.
I/O1
I/O2
I/O3
I/O4
Ws
W
QA1S35B
QA1S38B
325
305
0.3 mm.
30mm or
*2
more
Control
panel
30mm or
more
5mm or more
9 - 2
I/O5
I/O6
I/O7
QA1S65B
430
315
410
295
130
110
Programmable
controller
20mm or
*4
more
QA1S68B
420
400
Unit: mm
Door

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Qcpu-a seriesQ02cpu-aQ02hcpu-aQ06hcpu-a

Table of Contents