2Unpacking to installation

(2) Notes on base unit installation

If it installs the robot CPU system in the plate etc., please fully take into consideration the operativity,
conservativeness, and environment-proof.
1) Installation position for unit
To improve the airflow and change a module easily, provide clearance between the module top/bottom and
structures/parts as shown below.
Fig. 2-4 : Installation dimension of the robot CPU unit
2) Unit installation direction
a) Use the robot CPU system in the installation direction of the airy following figure because of heat
dissipation.
b) Don't use it in the installation direction of the following figure.
4) Installation surface
Install the base unit in the flat field. If the installation surface has unevenness, impossible force is applied
to printed circuit board , and it will become the cause of fault.
5) Mixture with other equipment
Mixture with the sources of vibration, such as large-sized magnetic contact and the no fuse breaker, is
avoided, and make it another panel, or detach and install.
2-12 Installation and connection