Installation; Unpacking Procedures; Transportation Procedures - Mitsubishi Electric CR800 Series Instruction Manual

Industrial robot, controller setup, basic operation, and maintenance
Hide thumbs Also See for CR800 Series:
Table of Contents

Advertisement

2.2 Installation

2.2.1 Unpacking procedures

The controller is shipped from the factory packaged in cardboard.Open the cardboard package and take out the
controller.

2.2.2 Transportation procedures

The following shows how to transport the controller.
Fig. 2-1 : Transporting controller
1) Slightly tilt the controller and put your hands underneath. Providing steady support with both hands, lift it up
and transport.
Be careful not to trap fingers when transporting the controller.
Mass
Approx. 12.5kg
2Unpacking to installation
Installation 2-7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cr800-dCr800-rCr800-q

Table of Contents