Siemens SINAMICS S120 Manual page 84

Cabinet modules liquid cooled
Hide thumbs Also See for SINAMICS S120:
Table of Contents

Advertisement

Electrical installation
4.5 Connections
The following diagram shows the heat exchanger after re-
leasing the connections described above.
Carefully and completely withdraw the heat exchanger.
Note
Correct attachment of the components and covers after connecting the DC busbars
After connecting the DC busbars in the cabinet units, the components and covers that were
removed must be correctly reattached again.
82
Remove the upper
and lower
take the heat deflection baffle
net.
Do not fully unscrew the screws as otherwise they can fall
into the control cabinet!
You can then establish the DC bus bar connection, see the
following section.
Equipment Manual, 04/2020, A5E37067587A
fixing screws and then
out of the electrical cabi-
Cabinet Modules liquid cooled

Advertisement

Table of Contents
loading

Table of Contents