Requirements On The Levelness Of The Floor - Siemens SINAMICS S120 Manual

Cabinet modules liquid cooled
Hide thumbs Also See for SINAMICS S120:
Table of Contents

Advertisement

Note
Interference to radio/wireless services due to high frequency (radio frequency) disturbances
The converter can cause high frequency disturbances, which may make interference
suppression measures necessary.
This device is not designed for unrestricted operation in the first environment (residential
environment) and may not be used in the first environment without suitable interference
suppression measures.
• Have qualified personnel install and commission the system with the appropriate radio
interference suppression measures.
3.3.2.2

Requirements on the levelness of the floor

The foundation at the installation location must be horizontal and level, to ensure proper
functioning of the cabinet units.
● Care must be taken to ensure that the doors can be opened and closed, the locking
systems work properly.
● Flat sections (such as doors, side panels) must be sealed correctly to ensure compliance
with the specified degree of protection.
● When connecting cabinet units side-by-side, ensure that no air can enter through gaps.
Figure 3-2
Cabinet Modules liquid cooled
Equipment Manual, 04/2020, A5E37067587A
Requirements on the levelness of the floor
Mechanical installation
3.3 Installing
51

Advertisement

Table of Contents
loading

Table of Contents