External Insulating Requirements - Trane CSAA Installation, Operation And Maintenance Manual

Performance climate changer air handlers indoor and outdoor units sizes 3 to 120
Hide thumbs Also See for CSAA:
Table of Contents

Advertisement

Start-Up
6. If the wheel has difficulty starting, turn off the power
and inspect for excessive interference between the
wheel surface and the four diameter seals. To correct,
loosen the diameter seal adjusting screws and back the
diameter seals away from the surface of the wheel.
Apply power to confirm that the wheel rotates freely.
Readjust and tighten the seals according to
instructions in
"Energy Wheel Seal Adjustment,"
p.
160.
7. Damper actuators (if so equipped): Stroke the
actuators to observe full open and full closure of
dampers. Adjust the actuator and/or linkage to prevent
"over-stroking" so excessive pressure is not placed on
the damper at the full open or full closed position.

External Insulating Requirements

The following areas should be specifically addressed, as
applicable:
Supply and return water piping connections
Supply and return refrigerant piping connections
Condensate drain lines and connections
Outdoor-air-intake duct connections
Discharge duct connections
Special requirements for low-temperature-air systems
Electric duct heaters mounted on the fan discharge
Important:
Minimum clearance from combustible
materials: 1 inch for first four feet of duct
142
CLCH-SVX07K-EN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents