Step 3: Unpack The Switch - NETGEAR M4300 Intelligent Edge Series Hardware Installation Manual

Fully managed stackable switches
Table of Contents

Advertisement

M4300 Intelligent Edge Series Fully Managed Stackable Switches
You can also take the following steps to prevent damage from electrostatic discharge
(ESD):
• When you unpack a static-sensitive component from its shipping carton, leave it in
the antistatic package until you are ready to install it.
Just before you unwrap the antistatic package, discharge static electricity from your
body.
• Before you move a sensitive component, place it in an antistatic container or package.
• Handle all sensitive components in a static-safe area.
If possible, use antistatic floor pads, workbench pads, and an antistatic grounding
strap.

Step 3: Unpack the switch

The following figure shows half-width model M4300-12X12F. The package contents for
the other half-width models (M4300-16X, M4300-8X8F, M4300-24X, and M4300-24XF)
are the same.
Figure 23. Switch package contents, half-width models
The following figure shows full-width model M4300-52G. The package contents for the
other full-width models (M4300-24X24F, M4300-28G, M4300-28G-POE+,
M4300-52G-POE+, M4300-48X, and M4300-48XF) are the same.
Installation
49
Hardware Installation Guide

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents