Step 3: Unpack The Switch - NETGEAR GC752XP Hardware Installation Manual

Insight managed 28-port and 52-port gigabit ethernet smart cloud switch with 2 sfp 1g & 2 sfp+ 10g fiber ports (and poe on gc728xp and gc752xp only)
Table of Contents

Advertisement

Insight Managed 28-Port and 52-Port Gigabit Ethernet (PoE+) Smart Cloud Switch
You can also take the following steps to prevent damage from electrostatic discharge
(ESD):
• When unpacking a static-sensitive component from its shipping carton, leave it in
the antistatic package until you are ready to install it. Just before unwrapping the
antistatic package, discharge static electricity from your body.
• Before moving a sensitive component, place it in an antistatic container or package.
• Handle all sensitive components in a static-safe area. If possible, use antistatic floor
pads, workbench pads, and an antistatic grounding strap.

Step 3: Unpack the Switch

The following figure shows the package contents.
Figure 7. Switch package contents
Letter
Description
a
Switch
b
Power cord with adapter
c
Category 5e (Cat 5e) flat Ethernet cable
d
Wall-mounting screws
e
Installation guide
f
Footpads
Installation
25
Hardware Installation Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gc728xpGc752xGc728x

Table of Contents