Step 3: Unpack The Switch - NETGEAR GC728X Hardware Installation Manual

Insight managed 28-port gigabit ethernet smart cloud switch with 2 sfp 1g & 2 sfp+ 10g fiber ports
Hide thumbs Also See for GC728X:
Table of Contents

Advertisement

Insight Managed 28-Port Gigabit Ethernet (PoE+) Smart Cloud Switch
When unpacking a static-sensitive component from its shipping carton, leave it in the antistatic package
until you are ready to install it. Just before unwrapping the antistatic package, discharge static electricity
from your body.
Before moving a sensitive component, place it in an antistatic container or package.
Handle all sensitive components in a static-safe area. If possible, use antistatic floor pads, workbench
pads, and an antistatic grounding strap.

Step 3: Unpack the Switch

The following figure shows the package contents.
Figure 6. Switch package contents
Check the contents of the boxes to make sure that all items are present before installing the switch.
To check the package contents:
1.
Place the container on a clean flat surface, and cut all straps securing the container.
2.
Unpack the hardware from the boxes by carefully removing the hardware and placing it on a secure
and clean surface.
3.
Remove all packing material.
4.
Verify that the package contains the following items:
a.
Switch model GC728X or GC728XP
b.
Power cord (localized to the country of sale)
c.
Rack-mounting brackets
d.
Rack-mounting screws
Installation
23