Cabinet D, Plexiglass And Inx Door Backbox Installation - Honeywell Gamewell-FCI E3 Series Installation & Operation Manual

Expandable emergency evacuation system
Hide thumbs Also See for Gamewell-FCI E3 Series:
Table of Contents

Advertisement

Installation

2.5.10.1 Cabinet D, Plexiglass and INX Door Backbox Installation

1.
Prepare the mounting site by pre-drilling four (4), #10 screws mounted to the studs, using the
dimensions shown in the figure below. Use four (4), #10 screws.
NOTE: If the fasteners are anchored to a wallboard, use #10 wall anchors.Mountings to concrete
walls should be backed by plywood to insulate the equipment from possible condensation.
2.
Secure with two (2), #10 screws in the two-hole mounting pattern as shown in Locations 1 and
2 of the figure below.
3.
Set the backbox over the top, two-hole mounting pattern, and hang the backbox on the two
screw heads.
4.
Insert and secure two (2), #10 screws in the two-hole mounting pattern as shown in Locations
3 and 4 of the figure below.
NOTE: Add knockouts to the left and right side of the rear panel of the backbox. Do not add
knockouts in the center or top of the backbox, above the ILI-MB-E3/ILI95-MB-E3/ANX, behind or
below the batteries. To add larger knockouts, increase the size of the existing knockouts.
4.50"
1.50"
1.70"
1.35"
41.00"
82
BACKBOX TOP
1.25"
BACKBOX
19.38"
16.00"
3.38"
.25"
.50"
1
38.31"
3
Figure 2.5.10.1.1 Cabinet D, INX Door Backbox Installation
E3 Series Installation/Operation Manual — P/N 9000-0574:I 11/04/10
BACKBOX DEPTH – 4.50"
16.38"
2
4
Cabinets
BACKBOX
SIDE PANEL
4.50"
1.50"
2.25"
8.00"
8.00"
8.00"
8.00"