Prime
Prime
Prime A and B Fluids
To help prevent injury from flush solvents and heated
fluids, wear gloves when using flush solvents and/or if
fluid temperature exceeds 110° F (43° C).
Do not install gun spray tip yet. To avoid splashing, use
the lowest pressure possible to prime.
1. Condition materials prior to adding to hoppers.
Ensure resin materials are thoroughly agitated,
homogenous, and pourable prior to adding to
hopper. Stir hardeners back into suspension prior to
adding material to hopper.
2. Fill A and B reservoirs with proper materials. Fill A
side with major volume of material; fill B side with
minor volume of material.
3. Move recirculation lines to empty containers.
28
20 Gallon Hopper Shown
4. Open ball valves into pumps.
5. Turn mix manifold valves (AH, AJ) clockwise to
close them.
AH
6. Turn on air supply. Set main pump air regulator
(CD) to 20 psi (138 kPa 1.38 bar).
7. Use manual pump run mode.
AJ
CD
312359M