Prime
Prime
Prime A and B Fluids
To help prevent injury from solvents and heated fluids,
wear gloves when using solvents and/or if fluid
temperature exceeds 110° F (43° C). To avoid
splashing, use the lowest pressure possible to prime.
NOTE: Do not install gun spray tip yet.
1. Condition materials prior to adding to hoppers.
Ensure resin materials are thoroughly agitated,
homogenous, and pourable prior to adding to
hopper. Stir hardeners back into suspension prior to
adding material to hopper.
2. Fill A and B hoppers with proper materials. Fill A
side with major volume of material; fill B side with
minor volume of material.
25-Gallon Stainless Steel Hopper Shown
3. Move recirculation lines to empty containers.
36
B
A
4. Open ball valves into pumps, or turn the feed pump
air valve to the open position and open the air
regulator to start the feed pump.
5. Turn mix manifold valves (AH, AJ) clockwise to
close them.
AH
6. Open recirculation valves (AC, AD).
AC
AJ
AD
312359R