Commissioning - WAGNER PXM Operating And Assembly Manual

Powder center
Table of Contents

Advertisement

VERSION 08/2015
OPERATING AND ASSEMBLY MANUAL
6.8

COMMISSIONING

The tank mounting and injector mounting plate must be horizontally aligned in all
directions.
The hose for the fl uid air must either be connected to the terminal for the box-fl uidizing
device (fl oor) or on the powder tank.
P_02589
Positioning of powder tank and tank cover!
Danger of damage to the device.
Align the powder tank or powder box on the vibrator table so that the suction system
can move in and out unimpeded.
Only insert the cover into the guides and push it back to the limit stop after lowering
the suction tubes.
Remove cover before powering up the intake tubes.
ORDER NUMBER DOC2350372
NOTICE
PXM
38

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents