Genie Z-33/18 Operator's Manual page 29

Dc power
Hide thumbs Also See for Z-33/18:
Table of Contents

Advertisement

First edition • First Printing
At the Platform Controls
14 Turn the key switch to platform control.
15 Pull out in the platform red Emergency Stop
button to the on position.
Result: SYSTEM READY will appear on the LCD
display screen.
Test Emergency Stop
16 Push in the platform red Emergency Stop
button to the off position.
Result: The LCD display screen will be blank.
17 Test each machine function.
Result: All functions should not operate.
18 Pull out the red Emergency Stop button.
Test the Horn
19 Press the horn button.
Result: The horn should sound.
Test the Foot Switch
20 Do not press down the foot switch and test each
machine function.
Result: No functions should operate.
Part No. 1257143
Test Machine Functions
21 Press down the foot switch.
22 Activate each machine function control handle
or toggle switch.
Result: All boom and platform functions should
operate through a full cycle. The descent alarm
should sound while the boom is lowering.
Test the Steering
23 Press down the foot switch.
24 Press the thumb rocker switch on top of the
drive control handle in the direction indicated
by the blue triangle on the control panel.
Result: The steer wheels should turn in the
direction that the blue triangles point on the
drive chassis.
25 Press the thumb rocker switch in the direction
indicated by the yellow triangle on the control
panel.
Result: The steer wheels should turn in the
direction that the yellow triangles point on the
drive chassis.
Z-33/18
Operator's Manual
Inspections
27

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents