Inspections
At the Ground Controls
1 Select a test area that is firm, level and free of
obstruction.
2 Turn the key switch to ground control.
3 Pull out the red Emergency Stop button to the
on position.
Result: The beacon (if equipped) should flash.
Test Emergency Stop
4 Push in the red Emergency Stop button to the
off position.
Result: All functions should not operate.
5 Pull out the red Emergency Stop button to the
on position.
Test Machine Functions
6 Do not push and hold the function
enable button. Attempt to activate
each boom and platform function
toggle switch.
Result: No boom and platform functions should
operate.
7 Press and hold the function enable button
and activate each boom and platform function
toggle switch.
Result: All boom and platform functions should
operate through a full cycle. The descent alarm
should sound while the boom is lowering.
26
Test Machine Functions
8 Pull out the platform red Emergency Stop
button to the on position. Turn the key switch to
platform control
9 Open the turntable cover
on the side of the ground
controls and locate the tilt
sensor.
10 Press down one side of the
tilt sensor.
Result: The alarm, located in
the platform, should sound.
Test Emergency Controls
11 Turn the key switch to ground control.
12 Pull out the red Emergency Stop button to the
on position.
13 Simultaneously hold the emergency
power switch on and activate each
boom function toggle switch.
Note: To conserve battery power, test each
function through a partial cycle.
Result: All boom functions should operate.