Genie Z-33/18 Operator's Manual page 26

Dc power
Hide thumbs Also See for Z-33/18:
Table of Contents

Advertisement

Operator's Manual
Inspections
Pre-operation Inspection
Be sure that the operator's, safety and
responsibilities manuals are complete, legible
and in the storage container located in the
platform.
Be sure that all decals are legible and in place.
See Inspections section.
Check for hydraulic oil leaks and proper oil
level. Add oil if needed. See Maintenance
section.
Check for battery fluid leaks and proper fluid
level. Add distilled water if needed. See
Maintenance section.
Check the following components or areas for
damage, improperly installed or missing parts and
unauthorized modifications:
Electrical components, wiring and electrical
cables
Hydraulic hoses, fittings, cylinders and
manifolds
Hydraulic tank
Drive and turntable motors and drive hubs
Wear pads
Tires and wheels
Limit switches and horn
Alarms and beacons (if equipped)
24
Nuts, bolts and other fasteners
Ground strap
Platform entry mid-rail or gate
Lanyard anchorage points
Check entire machine for:
Cracks in welds or structural components
Dents or damage to machine
Excessive rust, corrosion or oxidation
Be sure that all structural and other critical
components are present and all associated
fasteners and pins are in place and properly
tightened.
Be sure that both battery packs are in place
and properly connected.
After you complete your inspection, be sure
that all compartment covers are in place and
latched.
Z-33/18
First edition • First Printing
Part No. 1257143

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents