Behaviour On Bus Voltage Failure; Behaviour After Bus Voltage Recovery - ABB i-bus EIB Product Manual

Application unit time, intelligent installation systems
Hide thumbs Also See for i-bus EIB:
Table of Contents

Advertisement

®
ABB i-bus
EIB / KNX
4.2
Behaviour on bus voltage
failure
4.3
Behaviour after bus
voltage recovery
© 2006 ABB STOTZ-KONTAKT GmbH
Planning and application
In the event of a bus voltage failure, the Application Unit Time stores the
communication object values of the inputs and outputs for at least 1 h. If the
bus voltage failure lasts considerably longer, the stored communication
object values are lost.
Secure states after a bus voltage failure can be achieved by selecting the
parameter setting "Behaviour after bus voltage recovery".
To prevent an unwanted operational response after a bus voltage failure,
particular in larger installations, the installation of an uninterruptible power
supply is provided for the bus voltage and the scanning voltage of the
contacts.
245

Advertisement

Table of Contents
loading

This manual is also suitable for:

I-bus abz/s 2.1I-bus knx

Table of Contents