ABB i-bus EIB Product Manual page 111

Application unit time, intelligent installation systems
Hide thumbs Also See for i-bus EIB:
Table of Contents

Advertisement

®
ABB i-bus
EIB / KNX
© 2006 ABB STOTZ-KONTAKT GmbH
Commissioning
The parameter window Special day range is activated in the following way:
- by double-clicking on *** new special day *** or
- by pressing the right mouse button and selecting New special day in the
pop-up menu or
- by selecting Edit in the menu bar and then activating New special day in
the pop-up menu.
Fig. 119:
Parameter window: "Set special day range"
Start, End
By entering the date (on), time (at), start and end of the period, it is defined
which day routine should apply which deviates from the standard week
routine.
The date for the start and end can be set in the range between 1.1.2000 and
31.12. 2035. The representation is in numbers which are separated by full
stops in the sequence Day. Month. Year. Entries for the year in the range
36...99 are rejected. To the right of the input field for the date, there is a
button with which the calendar for the current date can be displayed. The
input of the date for the start and end can be carried out via the selection of
a date in the calendar or through the direct input of the date.
The displays for the hours and minutes can be edited separately via the
buttons Left arrow and Right arrow.
111

Advertisement

Table of Contents
loading

This manual is also suitable for:

I-bus abz/s 2.1I-bus knx

Table of Contents