Slant/Fin VGH-299-CH Installation And Service Manual page 89

High efficiency condensing gas boiler
Hide thumbs Also See for VGH-299-CH:
Table of Contents

Advertisement

Lock
Error
out
code
33
LWCO_1_
ERROR
34
LWCO_2_
ERROR
35
APS_NOT_CLO
SED_IN_POST_
PURGE
36
GAS_PRESSUR
E_ERROR
Table 14. 1
Description
Low water cut off 1 error
Low water cut off 2 error
Air pressure switch not
closing during post-purge
1
Gas pressure switch open
for more than
E2_GPS_Timeout
E93.1601EN032.C VGH installation manual
Cause
Solving
There is no water in
Check if there is enough
the heat exchanger
water in the heat exchanger
or not electrically
if not so fill up the system
connected
There is no water in
Check if there is enough
the heat exchanger
water in the heat exchanger
or not electrically
if not so fill up the system
connected
no air transport to
Check if there are any
the burner after
obstructions in the flue or air
heat demand; flue
intake, replace APS if
or air inlet is
jammed, connect air hose to
blocked or APS is
the air intake pipe, remove
jammed or air
any water from the hose.
signal hose not
connected to the air
intake pipe or water
in hose
wrong gas pressure
Check if gas pressure is in
on gas supply
limits of the gas pressure
switch.
89

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vgh-399-chVgh-500-ch

Table of Contents