Slant/Fin BOILERS Installation And Operating Instructions Manual

Oil-fired water and steam boilers/no. 2 oil

Advertisement

LIBERTY
OIL-FIRED WATER AND STEAM BOILERS/NO. 2 OIL

INSTALLATION AND OPERATING INSTRUCTIONS

SAFETY WARNING:
KEEP BOILER AREA CLEAR AND FREE FROM
COMBUSTIBLE
MATERIALS,
OTHER
FLAMMABLE VAPORS
FAILURE
TO
ADHERE
WARNING, MAY RESULT IN PERSONAL INJURY
OR DEATH AND PROPERTY DAMAGE.
CONTENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .PAGE
Ratings and Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . .2
Boiler Location . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
Clearances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
Chimney Requirements . . . . . . . . . . . . . . . . . . . . . . . . .3
Air Supply and Venting . . . . . . . . . . . . . . . . . . . . . . . . . .3
Controls and Accessories . . . . . . . . . . . . . . . . . . . . . . . .6
Piping for Steam Boilers . . . . . . . . . . . . . . . . . . . . . . . . .6
Cleaning Piping System . . . . . . . . . . . . . . . . . . . . . . . . .6
Piping for Water Units . . . . . . . . . . . . . . . . . . . . . . . . . . .6
Piping for Tankless Heater . . . . . . . . . . . . . . . . . . . . . . .7
Installing Burner . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7
Oil Supply Piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7
Wiring the Boiler . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7
Vent Piping and Draft Regulator . . . . . . . . . . . . . . . . . . .8
Precautions Before Starting . . . . . . . . . . . . . . . . . . . . . .8
Start-up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8
Cleaning and Filling New Water Boiler . . . . . . . . . . . . . .8
Blowing Off a Steam Boiler . . . . . . . . . . . . . . . . . . . . .6, 9
Cleaning and Filling New Steam Boiler . . . . . . . . . . . . .9
Low Water Cut-off Check-out . . . . . . . . . . . . . . . . . . . . .9
Pressure Control Check-out . . . . . . . . . . . . . . . . . . . . .10
Replacement of Steam Boiler . . . . . . . . . . . . . . . . . . . .10
Wiring Diagrams . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11-13
Burner Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14-19
Extended Shutdown . . . . . . . . . . . . . . . . . . . . . . . . . . .20
Freezing Protection . . . . . . . . . . . . . . . . . . . . . . . . . . . .20
Oil Burner . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .20
General Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . .20
GASOLINE
AND
AND
LIQUIDS.
TO
ABOVE
SAFETY
®
II
IMPORTANT: The installation of this equipment must conform
to the requirements of the authority having jurisdiction or, in
the absence of such requirements, to the Installation of Oil
Burning Equipment, ANSI/NFPA 31, latest edition, and to the
National Electrical Code ANSI/NFPA 70, latest edition. The
installation must also conform to the additional requirements in
this Slant/Fin Instruction Manual. Where there is any differ-
ence, the more stringent requirement shall govern.
In addition, where required by the authority having jurisdiction,
the installation must conform to American Society of
Mechanical Engineers Safety Code for Controls and Safety
Devices for Automatically Fired Boilers, No. CSD-1, latest
edition.
THIS MANUAL MUST BE LEFT WITH OWNER AND
SHOULD BE HUNG ON OR ADJACENT TO THE
BOILER FOR REFERENCE.
IMPORTANT: This boiler must be installed by a trained,
experienced, service technician, licensed for the installation
and servicing of oil burning equipment or otherwise qualified by
the authorities having jurisdiction over the installation.
Printed in U.S.A. 906
Part No. 43-0270
Publication No. LD-40
Rev. A

Advertisement

Table of Contents
loading

Summary of Contents for Slant/Fin BOILERS

  • Page 1: Table Of Contents

    Controls and Accessories ......6 Piping for Steam Boilers ......6 Cleaning Piping System .
  • Page 2: Ratings And Dimensions

    K Collar is oblong, will fit 6" diameter nominal connector. ¢ This dimension is from the boiler jacket to the center of the flue outlet. NOTE: All boilers under 300,000 Btuh input are tested and rated for capacity under the U.S. Department of Energy (D.O.E.) test procedures for boilers.
  • Page 3: Installation Requirements: Boiler Location

    LD-60 LD-70 1000 B. The Liberty II Boiler has full wet base sections which surround fire- box for maximum heat absorption of burning fuel, and low floor temperature. C. If boiler is to be located over buried conduit containing electric wires or telephone cables, consult local codes or the National Board of Fire Underwriters for specific requirements.
  • Page 4 See NOTE (2) below. (1) Test for sufficient air for combustion by infiltration by running this boiler for 30 minutes under all of the following conditions and at the same time: a) all doors, win- dows and other like openings must be closed, b) all fuel burning appliances should be FIRING, c) all exhaust fans and clothes dryers turned ON. At the above conditions the CO 2 , smoke and draft readings must be normal.
  • Page 5 LIBERTY II Figure 3a. Appliances located in confined spaces. Air from inside the building. See Table 2 (2.3). Figure 3c. Appliances located in confined spaces. Air from out- doors through ventilated attic. See Table 2 (2.4). Figure 3b. Appliances located in confined spaces. Air from out- doors.
  • Page 6: Controls And Accessories

    F. Combustion safety control — mounted on burner. PIPING IMPORTANT: Boilers are to be used with closed system. Any application that uses steam or water from system, causes the intro- duction of a frequent supply of fresh water into the boiler. This will cause damage to the boiler.
  • Page 7: Piping For Tankless Heater

    This is necessary, especially at low fuel oil flow rates (small nozzle sizes), to prevent nozzle plugging. See Slant/Fin publication on one-pipe and two-pipe fuel oil systems.
  • Page 8: Vent Piping And Draft Regulator

    I. There are a number of commercial preparations available from your distributor for cleaning and for corrosion protection conditioning the internal (waterside) surfaces of boilers. Follow the preparation manu- facturer’s instructions. DANGER: Use CAUTION when handling chemicals and draining hot water from a boiler.
  • Page 9: Cleaning And Filling New Steam Boiler

    A. Refill the boiler to the indicated water line. B. Bring water to boiling temperature, promptly. C. The boiler is now ready to be put into service or on standby. BLOWING OFF A LOW PRESSURE STEAM BOILER A. A 1-1/2" NPT tapping is provided in the front of the boiler (tapping no.
  • Page 10: Pressure Control Check-Out

    Open blow-off valve at bottom of control; water will pour out, flush- ing away sediment. Drain until water is clear — about a pail —then close valve. If level in gauge glass has dropped, add water to boiler to restore level.
  • Page 11: Wiring Diagrams

    LIBERTY II...
  • Page 12 GROUNDING CON DUCTOR: TWO GR EEN GROUND WIRES ARE FACTO GROUNDING CON DUCTOR: TWO GR EEN GROUND WIRES ARE FACTO FIELD WIRE A GROUNDED CONDU FIELD WIRE A GROUNDED CONDU WIRING FOR PACKAGED STEAM BOILER EQUIPPED WITH McDONNELL NO.67 L.W.C.O. WIRING FOR PACKAG ED STEAM BOILER EQUIPPED WITH Mc High-Pressure Limit Recommemded setting 0.5 PSI...
  • Page 13 LIBERTY II WIRING FOR PACKAGED STEAM BOILER For alternate option PS-801-120 L.W.C.O. or Hydrolevel Cycle Gard 450 L.W.C.O. High-Pressure Limit High-Pressure Limit Recomemmeded setting - 0.5 PSI Recomemmeded setting - 0.5 PSI Differential - 5 PSI Differential - 5 PSI...
  • Page 14 LIBERTY II...
  • Page 15 LIBERTY II BURNER DATA – BECKETT CF-375 BURNERS FOR PACKAGED BOILERS ONLY (For knocked-down & boiler burner units see publication no. L-42KB) Firing Rate Boiler Burner Model Model (GPH) LD-60 CF-375 2.60 LD-60 CF-375 2.85 LD-70 CF-375 3.00 LD-70 CF-375 3.10...
  • Page 16 LIBERTY II...
  • Page 17: Burner Data

    LIBERTY II BURNER DATA – RIELLO (continued) FIgure 9B MODEL F-10 ELECTRODE SETTING NOTE: ELECTRODES ARE PRESET AT THE FACTORY. REGULATION OF THE TURBULATOR AND AIR SHUTTER FOR PROPER COMBUSTION Turbulator Setting 1. Loosen nut, 1, then turn the screw, 2, until the index marker, 3, is aligned with the correct index number.
  • Page 18 LIBERTY II...
  • Page 19 LIBERTY II...
  • Page 20: Care And Maintenance

    There are a number of commercial heating sys- tem preparations available from your distributor. Follow the prepa- ration manufacturer’s instructions. For steam boilers, maintain a sodium chromate solution strength of 16 oz. per 50 gallons of water; and refill to the top of the gauge glass.

This manual is also suitable for:

Liberty ii ld-70Intrepid tr-30hIntrepid tr-20Intrepid tr-30-1.10Intrepid tr-30-1.25Intrepid tr-40h ... Show all

Table of Contents