INTRODUCTION

This manual is written for the Installer.
Slant/Fin is not accountable for any damage caused by failure to correctly follow these instructions. For service
and repair purposes use only original Slant/Fin spare parts.
All documentation produced by the manufacturer is subject to copyright law.
This manual is subject to change without notice.

Explanations.

VGH = Condensing Boiler
DHW = Domestic Hot Water
CH
= Central Heating (for central heating purposes and/or indirect hot water)
BCU = burner control unit
PB
= display board/ control panel (Pixel Button)
299/399/500 = Model number of the boiler.
Pump = Circulator (Sometimes, in the software e.g., the word "pump" is used, this is a circulator)

Maintenance and inspection

Visually inspect the venting system for proper size and horizontal pitch and determine there is no blockage or
restriction, leakage, corrosion and other deficiencies which could cause an unsafe condition.
Maintenance and inspection of the boiler must be carried out at the following occasions:
• When a number of similar error codes and/or lock-outs appear.
• At least every 12 months maintenance must be done to ensure safe and efficient operation.
Damage caused by lack of maintenance will not be covered under warranty

For installations in the Commonwealth of Massachusetts.

The following local requirements apply in addition to all other applicable NFPA requirements:
For direct- vent boilers, mechanical-vent heating appliances or domestic hot water equipment, where the bottom
of the vent terminal and the intake is installed below four feet above grade the following requirements must comply:
1) If not present on each floor level where there are bedrooms, a carbon monoxide detector and alarm must
be placed in a living area outside the bedrooms. The carbon monoxide detector and alarm must comply
with NFPA 720 (2005 Edition).
2) A carbon monoxide detector and alarm shall be located in the room that houses the boiler and/or
equipment and shall:
a) Be powered by the same electrical circuit as the boiler and/or equipment such that only one service
switch services both the boiler and the carbon monoxide detector;
b) Have battery back-up power;
c) Meet ANSI/UL 2034 Standards and comply with NFPA 720 (2005 Edition); and
d) Have been approved and listed by a Nationally Recognized Testing Lab as recognized under 527
CMR.
3) A product-approved vent terminal must be used, and if applicable, a product approved air intake must be
used. Installation shall be performed in strict compliance with the manufacturer's instructions. A copy of the
installation instructions shall remain with the boiler and/or equipment at the completion of the installation.
4) A metal or plastic identification plate shall be mounted at the exterior of the building, four feet directly above
the location of vent terminal. The plate shall be of sufficient size to be easily read from a distance of eight
feet away and read "Gas Vent Directly Below".
For direct-vent boilers mechanical-vent heating boilers or domestic hot water equipment where the bottom of the
vent terminal and the intake is installed higher than four feet above grade the following requirements must comply:
1) If not present on each floor level where there are bedrooms, a carbon monoxide detector and alarm must
be placed in a living area outside the bedrooms. The carbon monoxide detector and alarm must comply
with NFPA 720 (2005 Edition).
2) A carbon monoxide detector shall:
a) Be located in the room where the boiler and/or equipment is located;
b) Be either hard-wired or battery powered or both; and:
c) Shall comply with NFPA 720 (2005 Edition).
3) A product-approved vent terminal must be used, and if applicable, a product- approved air intake must be
used. Installation shall be in strict compliance with the manufacturer's instructions. A copy of the installation
instructions shall remain with the boiler and/or equipment at the completion of the installation.
8
E93.1601EN032.C VGH installation manual