Slant/Fin VGH-299-CH Installation And Service Manual page 113

High efficiency condensing gas boiler
Hide thumbs Also See for VGH-299-CH:
Table of Contents

Advertisement

Fiber braid replacement
If the high temp braided rope is damaged and needs to be changed, it has to be replaced by new braids using
the method described below.
The high temp braided rope is maintained by silicone glue.
- Remove electrodes.
- Remove the braids by sliding under the periphery
a thin tool to loosen the braids and remove it.
- Remove and clean the residues of the braids and
silicone glue.
Picture 19.6
- Engage the high temp braided rope and place it
in contact of the glue and press the braids.
- Reinstall electrodes
- Put a thin string of glue silicone temperature-
resistant in the seal housing. (Loctite 5366 or
Ottoseal S17)
Picture 19.7
E93.1601EN032.C VGH installation manual
Picture 19.5
113

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vgh-399-chVgh-500-ch

Table of Contents