Omron LD-105CT User Manual page 38

Cart transporter
Hide thumbs Also See for LD-105CT:
Table of Contents

Advertisement

3.3  Unpacking
2. Remove the front panel, and set it aside.
This will be used as a ramp, to roll the platform off of the crate base.
Removing the Upper Body of the Crate
1. There are six lag bolts and washers around the base of the crate, two in the rear and
two on each side. Remove all six lag bolts and washers.
2. Slide the upper body of the crate off of the base.
Take care as you slide it over the HMI post, watching the clearance between the crate
and the HMI post components.
The platform will still be held securely by the base of the crate.
38
Figure 3-3. Spring-loaded Latch
Figure 3-4. Crate Lag Bolts
CAUTION: Due to the weight and size of the crate upper body, and the
potential to damage the platform during this step, two people should
work together to remove it.
LD Platform Cart Transporter User's Guide