Confidential
Installation of the Other Modules
Pre-assembly A: Frame, paper supply assembly
Reassembly
Part name
step
1
Frame, paper supply
assembly
C.B.S-tite (M3 × × × × 5)
★
2
Damper
★
C.B.S-tite (M3 × 5)
6-30 Assembly and Disassembly
Secure the frame, paper supply assembly with C.B.S-tite (M3 × × × × 5).
× 1
× 2
<Check>
Tightening torque: 735 to 931 mN•m {7.5 to 9.5 kg•cm}
× 1
Stick the damper on the frame, paper supply assembly.
<Check>
Damper position to stick:
Right and left sides: The center from both sides.
Upper and lower sides: Align with the sticking surface on the plate.
Assembly procedure
damper
frame, paper supply
assembly
Rev. A