Preparing The Engine For A Long Period Of Inactivity - Komatsu WB93S-5 F50003 Operation & Maintenance Manual

Backhoe-loader
Table of Contents

Advertisement

LONG PERIODS OF INACTIVITY

3.14.2 PREPARING THE ENGINE FOR A LONG PERIOD OF INACTIVITY

NOTE
These operations must be carried out only if the engine is going to remain unused for more than 1 month.
q
The first two operations must be carried out only on engines that have already run for more than 200 hours.
q
1 - Drain the oil from the oil pan and fill it with washing oil FIAT L35.
2 - Start the engine and let it idle for 15 minutes.
Stop the engine and drain the oil.
3 - Fill the oil pan to the MIN. level with SAE 30 oil or with oil corresponding to the MIL - 2160B – type 2
specifications.
4 - Empty the fuel filters, disconnect the fuel pump intake pipe and connect it to an outside tank filled with CBF
(ISO 4113) oil.
5 - Start the engine and let it run at 800–1000 rpm for 15 minutes.
At this point, use a syringe to slowly spray 40 g of SAE30 oil or of an oil corresponding to the MIL - 2160B -
type 2 specifications into the suction manifold (taking approximately 10 seconds).
6 - Stop the engine and drain the oil from the oil pan.
NOTE
Recovered oil can be used again, for other two or three times, when preparing the engine for a long period of
q
inactivity.
7 - Loosen the alternator, fan and coolant pump belts.
8 - Reconnect the fuel pump intake pipe to the fuel tank.
9 - Seal the exhaust pipe and all the intake and breather openings with adhesive tape and vynil bags.
10 - Position a sign with the clear writing "NO ENGINE OIL" on the steering wheel and on the engine.
IMPORTANT
These operations must be repeated every 6 months.
q
3.14.3 MAINTENANCE DURING A PERIOD OF INACTIVITY
NOTE
These operations must be carried out once a month.
q
1 - Recharge the battery and install it on the machine.
2 - Remove the seals from tank, exhaust pipe and breather outlets.
3 - Check the tyre pressure and remove the support blocks from under the machine.
4 - Start the engine and let it idle for 15 minutes.
5 - While warming the engine, remove the protection grease from the exposed rods of the hydraulic cylinders.
6 - Before moving the machine, make sure that the instruments, warning lights, lights, direction indicators,
windshield wipers and stop lights function correctly.
7 - As soon as possible, warm the hydraulic cylinders by slowly lifting and extending all the equipment more than
once.
8 - Travel for short distances at low speed, applying the brakes every now and then to allow the braking surfaces
to settle down.
158

Advertisement

Table of Contents
loading

Table of Contents