Dismantling The External Panels - Biasi Inovia 25S ERP User Manual And Installation Instructions

Wall hung, fanflue, roomsealed, high efficiency gas boiler
Hide thumbs Also See for Inovia 25S ERP:
Table of Contents

Advertisement

Fig. 10.4
• By pressing key 13 (Fig. 10.1) confirmation
of the inserted value is obtained.
• Press keys 16 or 17 to exit without changing
the value.
• Exiting the "programming mode" is auto-
matic, after 15 minutes, or by cutting power.
After maintenance, if the value is left on 0 the
maintenance symbols will not disappear but
instead continue to flash, as they did prior to
maintenance.
The remaining months until maintenance will
be replicated in read only in the 'info' section
under value J15.
N.B.: The flashing symbol in Fig. 10.5 is not
an error. The boiler continues to run normally
but it indicates the expiry of the maintenance
period.
Fig. 10.5

10.3 Dismantling the external panels

Front panel
• Unscrew screws "A" and remove the front
panel "D" by pulling it and pushing it towards
the top so that it is freed from the top hous-
- 70 -
MAINTENANCE
ings (Fig. 10.6).
Side panels
Loosen screws "B - F" and "C - H" in Fig. 10.6
and remove the two side panels "E" and "G"
by pulling towards the outside.
A
B
F
G
Fig. 10.6
Control panel
Turn the controls panel "I", as shown in figure
Fig. 10.7, to access in an optimal manner the
components inside the boiler.
C
E
H
D

Advertisement

Table of Contents
loading

This manual is also suitable for:

41-583-30

Table of Contents