Biasi Inovia 25S ERP User Manual And Installation Instructions page 48

Wall hung, fanflue, roomsealed, high efficiency gas boiler
Hide thumbs Also See for Inovia 25S ERP:
Table of Contents

Advertisement

INSTALLATION
is controlled by the external control terminal
block.
In Fig. 6.31 the boiler is not permanently con-
nected to the supply line. The boiler operation
is controlled by switching the mains supply.
In this case, when the boiler is switched off
some important features like the antifreeze
system, the monitoring of the boiler by the op-
eration lights, the post circulation of the pump,
etc. are completely deactivated.
For these reasons it is advisable to use the
first diagram (Fig. 6.30).
- 48 -

Advertisement

Table of Contents
loading

This manual is also suitable for:

41-583-30

Table of Contents