A
B
32
Fig. 7.9
If it does not comply with the required pres-
sure check the gas supply line and governor
for faults and/or correct adjustment.
Where the boiler is connected to a gas sup-
ply which has a zero set governor then it is
necessary under the Gas Safe (Installation
and Use) Regulations 26.9. to perform a
combustion analysis test for CO/CO
limits for the boiler is given in "Technical
Data" section pag. 28 Inovia 25S ERP:
CO
contents / other flue gas figures) and
2
complete the Certificate of Exemption sec-
tion of the Benchmark.
Important: after the checks all of the test
points must be sealed and tested for tight-
ness.
7.8

Lighting the boiler

Some products incorporate an anti cycling
time delay. It is normal when first switching the
boiler on for the boiler to operate on heating
for a few seconds then switch off. After 3-4
minutes has elapsed the boiler will then re ig-
nite and operate perfectly normally.
- 56 -
COMMISSIONING
If external controls are fitted (e.g. Timeclock,
room thermostat) ensure they "call for heat".
• Electrically power the boiler by switching
on the double pole isolation switch. The
LCD will display, the
7.10).
Fig. 7.10
• Press the 13 key for 2 seconds until
symbol appear on the display Fig. 7.11.
10
11
12
(The
2
Fig. 7.11
The LCD display displays the boiler tempera-
ture (primary circuit) and the
Fig. 7.12.
Fig. 7.12
• Open the gas cock
• Make sure that the ambient thermostat is in
the "heat request" position".
• Check the correct functioning of the boiler
both in domestic hot water mode and in
heating mode.
• Check the gas pressures and flow rates as
symbol (Fig.
13 14
17
16
15
symbol