Annual Maintenance; Warnings; Dismantling The External Panels; Emptying The D.h.w. System - Biasi Riva Advance Combi Installation & Operation Instructions

Wall hung gas boiler for central heating supply
Table of Contents

Advertisement

17. Annual Maintenance

The procedures detailed in this chapter must be carried out only by a professionally qualified
person. Thus you are advised to contact an Authorized Service Man.
For efficient and continuous operation of the boiler you are advised to have, at least once a
year, maintenance and cleaning done by an Approved Service Person.
Isolate the appliance from the electricity supply by turning off the fused spur isolation switch
adjacent to the appliance and turn off the gas cock, before carrying out any procedures,
whatsoever, for cleaning, maintenance, opening or dismantling of boiler panels.
Front Panel:
• Loosen the three screws A (Fig. 17.1)
• Lift and remove the panel.
Side Panels:
• Loosen the screws B (Figure 17.2). Bring the bottom of the panels away from the boiler and
lift them, freeing them from the top hooks.
• Take off the front panel of the case, then the sealed chamber lid and the front panel of the
combustion chamber.
A
Figure 17.1
• Close the pressure reducing automatic fill
valve (43 on Section 4)
• Open the central heating drain cock (F in
Fig. 17.3).
• Empty the c.h. system.
• Close the central heating drain cock (F in
Fig. 17.3).
• Open the pressure reducing automatic fill
valve (43 on Section 4)
RIVA ADVANCE COMBI MANUAL

17.1 Warnings:

17.2 Dismanteling the external panels:
A
A

17.3 Emptying the d.h.w. system:

B
B
B
B
Figure 17.2
Figure 17.3
F
58

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents