(4) Proceed to the next procedure according to the following condition.
→ When Base Unit state is "AC Power Off".
Turn on AC power to all PSU, and wait until green indicator of the "System Power" turns off.
And, proceed to
→ When Base Unit state is "AC Power On, System Power Off".
Turn on AC power to the installed PSU then wait for about 5 minutes.
And, proceed to
→ When Base Unit state is "AC Power On, System Power On".
Turn on AC power to the installed PSU then wait for about 5 minutes.
And, proceed to
SET1104000
11.4 Setup
No work.
"11.5.2 Verifying operation (System Power
"11.5.2 Verifying operation (System Power
"11.5.1 Verifying operation (System Power
Off)".
Off)"
On)"