SET1202000
12.2 Work Items, Work Assignment, and Work Time
"Table 12.2" lists the work items, standard work time, and the person in charge of these types of work.
Work item
Checking the delivered items
Installing option
Verifying operation
Preparation of handing over to
the System Administrator
Handover to the system administrator
SET1203000
12.3 Procedure for Installing M.2 Flash Device
SET1203010
12.3.1 Checking the delivered items
(1) Check the delivered items by confirming the following.
1. The types and quantities of delivered options match those written on the order sheet.
2. The delivered items match those listed in the List of Accessories.
3. All cabinets are free of any abnormalities such as scratches, dents, or dirt.
4. The specifications and version level of units delivered separately due to delivery considerations
are available for the target functions.
(2) Proceed to
SET1203020
12.3.2 Installing option
Install according to the following procedures.
ANNT)
- The installation location and quantity have to indicate by the system administrator.
- Confirm connecting position of power cable of the Base Unit beforehand.
(1) Turn off AC power of the Base Unit.
(2) Remove the SB#0.
See Appendix F.2.2
(3) Install the M.2 Flash device onto BMM UNIT of the SB#0.
See Appendix F.14
(4) Install the SB#0.
See Appendix F.2.1
(5) Turn on AC power of the Base Unit.
→ Wait until green indicator of the "System Power" turns off.
(6) Make sure that the Alarm indicator of SB#0 is not lit. (See "Figure 12.3.2".)
"12.3.2 Installing
option".
"Removing
SB".
"Installing M.2 Flash
"Installing
SB".
Table 12.2
Person in charge
Service engineer
Service engineer
Service engineer
Service engineer
System administrator and
Service engineer
Device".
80
Work time
(minute)
5
10
15
1
5