SET1105000
11.5 Verifying operation
SET1105010
11.5.1 Verifying operation (System Power On)
Confirm the PSU according to the following procedures.
(1) Click on "System" tab, and click on "Power", and click on "Power Supplies".
→ The window shown in "Figure 11.5.1" appears.
(2) Confirm that installed PSU is no problem. (See "Figure 11.5.1".)
(3) Download the SEL to the operation terminal. (See Appendix E.8
(4) Proceed to
"11.6 Preparation of handing over to the system
Figure 11.5.1
administrator".
75
"SEL
downloading".)