SET0202000

2.2 Work Items, Work Assignment, and Work Time

"Table 2.2" lists the work items, standard work time, and the person in charge of these types of work.
Work item

Checking the delivered items

Installing option

Verifying operation
Preparation of handing over to
the system administrator
Handover to the system administrator
SET0203000

2.3 Procedure for installing a system board

SET0203010
2.3.1 Checking the delivered items
(1) Check the delivered items by confirming the following.
1. The types and quantities of delivered options match those written on the order sheet.
2. The delivered items match those listed in the List of Accessories.
3. All cabinets are free of any abnormalities such as scratches, dents, or dirt.
4. The specifications and version level of units delivered separately due to delivery considerations
are available for the target functions.
(2) Proceed to
SET0203020

2.3.2 Installing option

Install according to the following procedures.
ANNT)
- The installation location and quantity have to indicate by the system administrator.
- Confirm connecting position of power cable of the Base Unit beforehand.
(1) Turn off AC power of the Base Unit.
(2) Remove the system board dummy.
(3) Install the system board.
(4) Turn on AC power of the Base Unit.
→ Wait about a minute until green indicator of the "System Power" is turned off.
(5) Make sure that the Alarm indicator of the system board is not lit. (See "Figure 2.3.2".)
"2.3.2 Installing
option".
Table 2.2
Person in charge
Service engineer
Service engineer
Service engineer
Service engineer
System administrator and
Service engineer
22
Work time
(minute)
5
30
5
1
5